WATER UTILITY
|
|
WATER SYSTEM OPERATION AND MAINTENANCE, BACKFLOW ASSEMBLY TESTING,
CROSS CONNECTION SPECIALISTS
Zwald Transport is the Operator of Record for three water systems in Tillamook County: Pleasant Valley Water,
503-815-9662, Long Prairie Water, 503-842-2158 and Kilchis Water District, 503-842-6444. We have on staff a certified Cross Connection Control Specialist, a certified Backflow Assembly Tester, and can provide "on-call" emergency repair services 24/7 for any local water systems.
 Pressure testing after installing a new hydrant at Rocky Road in Tillamook.
|

Nonda testing a 6" Watts Double Check for Long Prairie Water.
|
| |
|

Residential meters in Pleasant Valley Water: BEFORE!
|

Residential meters in Pleasant Valley Water: AFTER!
|
| |
|
 We lost about 100 feet of our 8 inch AC Mainline in the Fawcett Creek washout. The Red pointer is pointing to a little black circle under the left edge of the pavement is our line. |
 Capping off our mainline after the Fawcett Creek washout. |
| |
|
 Protecting our mainline at the LP/Highway 101 intersection while crews rebuild the shoulder of the road after floodwaters washed it out. |
 Repairing a break in Pleasant Valley's 8" AC mainline on Hwy 101. |
| |
- Top of Page - |
|